Work is in progress installing the solar system and ceiling in the new building. Modifications are also being made to the solar system in the dormitory. Lower wattage lights are being installed to allow the power to last longer ,including switching the current to DC rather than AC. One socket is being left on A/C to charge mobile phones. These are vital for keeping in touch with staff.